agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

What is the answer for N+4=6
He took the bad news with surprising 1.witheredness 2.pavilion 3.detachedness 4.resignation and showed no emotion
Other planets have an atmosphere, but Earth's is unique because it has large amounts of _____. nitrogen oxygen water vapor
a joint stock company was
(x - y)^2 + 4z(x - y) +3z^2 (and btw ^2 means squared and this is going for 10 points)
What is the inequality for the question 3x-2<10
Solve each equation for the indicated variable T=an+b (solve for B)
How to estimate 586-321 two different ways
Did the coahuiltecans farm?
The summer drama club charge $4 per student or admission to a play. The club borrowed $400 from parents to pay for costumes and props. After paying back the par