aaleal283 aaleal283
  • 02-05-2022
  • Mathematics
contestada

3. Which value is not needed to construct a box plot?
A. upper quartile B. minimum value
C. median
D. mean

Respuesta :

shantelgrundy shantelgrundy
  • 02-05-2022
the answer is d because
Answer Link

Otras preguntas

A fifth-degree polynomial with leading coefficient 4
Meaning of battle sweat
three of the following are base units used in the metric system. which is not a base unit? meter liter kilogram gram
What time does pm start??
When may a hypothesis be revised?
how to sole this (4x-3y)2
Help me and I'll do the same
use the drop-down menus to describe the key aspects of the function f(x) = –x2 – 2x – 1. the vertex is the . the function is increasing . the function is decrea
what is England famous for?
Which describes the effect of stress on the circulatory system during the alarm stage?