maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

what is 69 / 2 in a decimal
In the late 1930s and early 1940s, United States increased defense expenditures, instituted the peacetime draft, and passed the Lend-Lease Act, indicating that
_____ is the process by which internal environments of an organism are regulated. -tropism -homeostasis -geotropism
Although the National Assembly was made up of the Third Estate, many members did not want to seize the Catholic Church’s property. the members did not want a co
What is 5 divide by 312
What is the most important reason the Indo- European languages dominate the globe geographically today? A. Europeans trade more than other people. B. European
Choose the function of the underlined word in the sentence. An assistant stamped each BOOK with the day's date.
Which statement about the soviet economy under Joseph Stalin is accurate
Which of these events in history does seidman say occurred in direct violation of the constitution? a. the attack of Fort Sumter b. the Emancipation Proclamat
Chemistry: counting atoms in compounds worksheet #7.0.1 Answer please!!!!!