medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Males tend to prefer which type of gambling more than females?
Solve x^2= 20 , where x is a real number.
Evaluate the expression for c = –1. c2 − 28c + 9 = Evaluate the expression for c = –1. c2 − 28c + 9 =
What is 3.666 rounded?
A driver is 35 feet below sea level . After he swims up 10 feet toward the surface , what is his elevation
what kind of code defines where text breaks to a new paragraph? a) html tag b) css property c) server-side script d) client-side script
A visual tool that works hand in hand with the agent's dialogue is the ________.
vectors A and B have the same magnitude but point in different directions, Which vector has the larger x component and which vector has the largest y component.
18. In rectangle ABCD, length AB measures (2x - 5) cm while length CD measures(5x-14) cm. If the breadth BC of the rectangle measures (1.6x - 3.9) cm, then find
Solve x^2= 20 , where x is a real number.