Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

FInd the volume of the figure
Are the numbers 10 and 10% the same? By what percent is the number smaller than the greater one?
Let f(x)=x^2+3x-4 and g(x)=x+5. Find f(x)•g(x) a. x^3+3x^2+16x-20 b. x^3+5x^2+14x-20 c. x^3-8x^2+11x-20 d. x^3+9x^2+19x-20
assume the question has a solution for z .. solve for z z = ____
Name the operation you should perform first. 1. 4 x 6- 3 2. 1 + 8 ÷ 2 3. (2 + 5) - 4^2 4. 7 ÷ 7^3 x 7 5. 8^2 ÷ (8 - 4)^2 6. - 4 + 3^3 ÷ 5
On October 1, Sam reported the formal marketing
QUESTION 9 What should be included in the total measurement of output? O a. Formed stools. O b. Perspiration. C. Emesis. O d. Sputum.
BRAINLIEST Completa el espacio en blanco con la mejor respuesta con el Presente Subjuntivo Irregular (Present Subjunctive Irregular) El sacerdote les aconseja q
triangle ABC is similar to triangle XYZ. fine side a
A doctor instructed her patient to take regular insulin injections. Without the insulin, the patient’s body will not maintain homeostasis and will be in danger