how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

HELPPPPPPPPPP PLEASEEEEEEEE!!!!!!
Correct answer please? I cant figure it out
An airfoil of chord length 2m and span 15 m has an angle of attack as 6 0 .the airfoil is moving with a velocity of 80m/s in air whose density is 1.25kg/m3 .
On dispose d'un carré de métal de 40 cm de côté. Pour fabriquer une boîte parallélépipèdique, on enlève à chaque coin un carré de côté x et on relève les bords
Solve for the unknown in the following equation 2/x + 1 = 3/4​
f(x)=2x-8 g(x)=x^(2) Find a value of x such that fg(x)=0.
Length=4cmbreadth=3cmWhat is a volume????​
convex or concave polygon?
Does anyone have a representation of the Pytagorean theorem
Blocks with masses of 3.0 kg , 4.0 kg , and 5.0 kg are lined up in a row on a frictionless table. All three are pushed forward by a 20 N force applied to the 3.