How deep is the service duct bank measured from finish grade to the top of the concrete encasement that runs between the D.L. pad mount transformer and the main electrical switchboard

Respuesta :

RayCrochet RayCrochet
  • 03-10-2019

Answer:2' 6

Explanation:

E1.1

2 feer deep 6 inch divider

Answer Link

Otras preguntas

A bowling ball and a bag of potato chips are dropped at the same time from a tall tower on the moon. there is no air on the moon. what happens?
what is special about the f and j keys on a standard keyboard?
Why do our faces get bloated while we sleep?
What is 679 round to the nearest 10,100,1000
What happens if you eat too much sugar? Be very specific
How did the Meiji reform education in Japan?
describe the human body response at the cellular level to perceived starvation threats as one person is dieting or ill. Tell why this was needed in human beings
what is the exact value of x 4*6^3x=221
Do you think that the Lilliputians are Hypocrites
what happens to the value of the expression 80/h as h increases